TPCG Residents Business Government Visitors Online Services Contact Us Help
You are here:
 

Engineering

Capital Projects Administrator Jeanne Bray

 
 

Capital Projects List

Below is a list of the current projects under the management of the Engineering Division which covers projects from the conceptual to the construction phase. The listing of a project does not mean that the project will be completed in this year. These are projects that are either being considered for funding for construction or have been funded for construction by the TPCG.

Refer to Chapter 24 for the subdivision codes of Terrebonne Parish.

Cancel
Project Number Project Type Consultant Current Project Status
00-PS-33 Drainage T. Baker Smith, Inc. New 4-1 FD Pump Station Complete
00-WALK-06 Recreation Picciola & Associates Gray Pedestrian Path Phase 2 Design
00-WALK-06 Recreation Picciola & Associates Gray Pedestrian Path Phase 3 Complete
01-AUD-26 Building Marcello & Associates Dumas Auditorium Improvements (Parking) On Hold
01-DRA-11 Drainage GSE Assciates Bayou Lacarpe Drainage Improvements Phase A Preliminary
01-DRA-11 Drainage GSE Assciates Bayou Lacarpe Drainage Improvements Phase B Construction
01-DRA-11 Drainage GSE Assciates Bayou Lacarpe Drainage Improvements Phase C Preliminary
01-DRA-40 Drainage T. Baker Smith, Inc. 1-1B System Channel Improvements Phase 1 Complete
01-DRA-40 Drainage T. Baker Smith, Inc. 1-1B System Channel Improvements Phase 1A Complete
01-DRA-40 Drainage T. Baker Smith, Inc. 1-1B System Channel Improvements Phase 1B Preliminary
01-DRA-40 Drainage T. Baker Smith, Inc. 1-1B System Channel Improvements Phase 1C Preliminary
01-DRA-40 Drainage T. Baker Smith, Inc. 1-1B System Channel Improvements Phase 1D Preliminary
01-DRA-40 Drainage T. Baker Smith, Inc. 1-1B System Channel Improvements Phase 2 Design
01-DRA-40 Drainage T. Baker Smith, Inc. 1-1B System Channel Improvements Phase 2A Preliminary
01-DRA-40 Drainage T. Baker Smith, Inc. 1-1B System Channel Improvements Phase 3 Design
01-DRA-44 Drainage T. Baker Smith, Inc. Mount Pilgram Forced Drainage System Design
02-DRA-28 Drainage T. Baker Smith, Inc. 1-1A Drainage Improvements Phase 1 Complete
02-DRA-28 Drainage T. Baker Smith, Inc. 1-1A Drainage Improvements Phase 2 Bidding
02-DRA-28 Drainage T. Baker Smith, Inc. 1-1A Drainage Improvements Phase 3 Design
02-DRA-28 Drainage T. Baker Smith, Inc. 1-1A Drainage Improvements Phase 4 On Hold

Contact

Hours of Operation

  • Monday thru Friday
  • 8:00 a.m. to 4:30 p.m.

Physical Address

  • 2000 St. Louis Canal Road
  • Houma, LA 70364

Mailing Address

  • P. O. Box 2768
  • Houma, LA 70361
 
Return To Top