
Valhi Blvd. Road Work And Closure
Road work to install a drainage crossing in the 600 block of Valhi Boulevard (next to Haydel Dermatology) will begin Thursday, November 3, 2016, at 9 a.m. The road will be CLOSED in both directions from 9 a.m. to 2:30 p.m., with traffic being detoured at Lynwood Dr. and Summerfield Dr.
Work will continue on Friday, November 4, and Saturday, November 5, with alternating lane closures, although traffic will be flagged through in both directions.